Camas County School District Restroom & HVAC Upgrades
Status
Accepting Bids
| Prebid Date | 1/23/26 10:00am |
| Bid Date | 2/4/26 2:00pm |
Company & Contacts
Location
Fairfield, Idaho
To Access the Free download you just need to register with Docuproject.
The scope of this project includes the renovation of existing restrooms and the replacement of the mechanical
system in a portion of the existing building. The restroom renovations will include complete demolition of
existing walls, plumbing fixtures, finishes, partitions and associated components. The new restrooms will
include wall framing, plumbing fixtures, toilet partitions, and new finishes. Minor interior work will also be
included to accommodate the new HVAC system and installation of ductwork and piping in existing ceiling
spaces and crawlspaces. The project includes re-roofing of approximately 300 square feet of existing roofing
system with a new TPO roof membrane. Sitework associated with locating new ground mounted HVAC
equipment, new concrete slabs, sidewalks, entry stairs and handrails are also included
