DPW-25270- IU West Campus Entry Gateway Improvements
Status
Accepting Bids
Prebid Date | 7/17/25 2:00pm |
Bid Date | 7/24/25 2:00pm |
Company & Contacts
Location
Moscow, Idaho, Idaho Ave University of Idaho
A description of the work of this project can be summarized to include: West Campus Entry Gateway
Improvements, Idaho Ave: this project includes a new monument sign intended to welcome visitors to the
athletic venue facilities, as well as providing athletic branding for the University of Idaho. The new
monument signage will be located on the southeast corner of Perimeter Drive and Idaho Avenue with
associated ornamental fencing on the northeast corner of Perimeter Drive and Idaho Avenue. The new
monument sign includes the signage wall with lettering along with the “Joe Vandal” logo, with gothic
rail/fencing, tall banner structures as bid alternate. Landscaping and irrigation are included with the new
monument sign as well as repairs for existing irrigation zones and existing plantings. New electrical will be
extended from the stub out location previously installed under previous work last year for the lighting the
letters and banners poles.
Estimated Cost: $353,282